City of New Bedford roadwork sites for week of October 31– November 5

image_pdfimage_print

The City of New Bedford – Department of Public Infrastructure Acushnet Ave & Wamsutta St Railroad Bridge:

•Contractor will be working on miscellaneous items throughout the project.

•The roadway closure at Acushnet Ave & Wamsutta will remain closed. Please follow detour signs.

Other:

•MASSDOT will be performing bridge repairs at Phillips Rd. over the RT 140 location.

•MASSDOT will be performing bridge repairs at County St and Purchase St over the I-195 East Bound.

•The Contractor is scheduled to complete final trench paving at various intersections along Ashley Blvd between Park Ave and Deane St.

•Contractor will be building the Cove Walk between West Rodney French Blvd. and Cove Rd.

•Contractor will be building an extension to the Multi use path on West Rodney French Blvd, between Hazelwood Park and Hurricane Barrier gate.

•Contractor will be installing cement concrete wheelchair ramps and sidewalks on Tallman Street, Bullard Street and Nye Street between Acushnet Avenue and Belleville Avenue.

•Contactor will be paving miscellaneous patches thougout the city.

•Hydrant flushing on dead ends in the city. This may cause a temporary loss of water pressure.

About NewBedfordGuide

Check Also

Wareham Police charge 42-year-old man with Intent to Distribute Fentanyl

On May 8, 2024, the Wareham Police Criminal Investigation Division along with the Patrol Division …

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Translate »